• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CHAPTER 1 INTRODUCTION - TM-5-5420-212-23_13
OFFICIAL NOMENCLATURE, NAMES AND DESIGNATIONS
OFFICIAL NOMENCLATURE, NAMES AND DESIGNATIONS (cont) - TM-5-5420-212-23_15
OFFICIAL NOMENCLATURE, NAMES AND DESIGNATIONS (cont) - TM-5-5420-212-23_16
Section II.   EQUIPMENT DESCRIPTION AND DATA
FIGURE 1-3  Link reinforced MGB
LOCATION AND DESCRIPTION OF MAJOR COMPONENTS
Bankseat Beam (BSB)
Bankseat Beam (BSB) (cont) - TM-5-5420-212-23_21
Bankseat Beam (BSB) (cont) - TM-5-5420-212-23_22
Deck Unit
Bridge Marker Guide - TM-5-5420-212-23_24
Bridge Marker Guide - TM-5-5420-212-23_25
Bottom Panel (BP)
Junction Panel (JP)
End Taper Panel (ETP)
Sway Brace
Panel Pin
Bracing Pin
Baseplate, Double Story
Adjustable Support
Frame Cross Girder
Roller Beam (RB)
Longitudinal Girder
Jack Seat
Jack Post - TM-5-5420-212-23_38
Jack Post - TM-5-5420-212-23_39
Rear Section
Launching Nose Heavy (LNH)
Launching Nose Roller (LNR)
Launching Nose Cross Girder Post
Launching Nose Cross Girder (LNCG)
Landing Roller (LR) - TM-5-5420-212-23_45
Landing Roller (LR) - TM-5-5420-212-23_46
Building Pedestal (BP) - TM-5-5420-212-23_47
Building Pedestal (BP) - TM-5-5420-212-23_48
Launching Nose Pin
Panel Erection Aid - TM-5-5420-212-23_50
Carrying Handle
FORK END ANCHORS
Anti-flutter Tackle - TM-5-5420-212-23_53
Push Bar Long
Footwalk Bearer
Capsill
Footwalk
Davit Post Assembly
Launching Nose Link (LNL)
Long Reinforcing Link
Short Reinforcing Link
Footwalk Post
Post Tensioning Assembly (PT)
Puller
Rocking Roller - TM-5-5420-212-23_65
Guard Rope
Light Tackle (LT)
Support  Equipment.
Truck, 5 Ton Dump (Tactical Models)
Pallet Adapter - TM-5-5420-212-23_70
Pallet Rear Buffer Assembly
Strap, 5,000 lb
Strap, 10,000 lb
Equipment Basket
Packing
EQUIPMENT DATA - TM-5-5420-212-23_76
EQUIPMENT DATA - TM-5-5420-212-23_77
EQUIPMENT DATA - TM-5-5420-212-23_78
EQUIPMENT DATA - TM-5-5420-212-23_79
EQUIPMENT DATA - TM-5-5420-212-23_80
EQUIPMENT DATA - TM-5-5420-212-23_81
EQUIPMENT DATA - TM-5-5420-212-23_82
EQUIPMENT DATA - TM-5-5420-212-23_83
EQUIPMENT DATA - TM-5-5420-212-23_84
EQUIPMENT DATA - TM-5-5420-212-23_85
EQUIPMENT DATA - TM-5-5420-212-23_86
EQUIPMENT DATA - TM-5-5420-212-23_87
EQUIPMENT DATA - TM-5-5420-212-23_88
Section III.  PRINCIPLES OF OPERATION
FIGURE 1-5  Launching Single Story Bridges over 50ft (15.2m)
FIGURE 1-7  Launching Double Story Bridges up to 108ft (32.9m)
FIGURE 1-8  Double Story Bridge in Place
FIGURE 1-11  Link Reinforced MGB in Place
FIGURE 1-13  MGB Components on Pallet for Transportation
CHAPTER 2 UNIT MAINTENANCE
Section III.  SERVICE UPON RECEIPT
FIGURE 2-1  Stress corrosion cracking
FIGURE 2-3  Exfoliation corrosion
FIGURE 2-4 Paint checking
FIGURE 2-6 Paint crocodiling
FIGURE 2-9 Paint blistering
FIGURE 2-11 Omission of paint primer
LIFTING EQUIPMENT
TABLE 2-3  Unit Preventive Maintenance Checks and Services - TM-5-5420-212-23_104
TABLE 2-3  Unit Preventive Maintenance Checks and Services - TM-5-5420-212-23_105
TABLE 2-3  Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_106
TABLE 2-3  Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_107
TABLE 2-3  Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_108
TABLE 2-3  Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_109
TABLE 2-3  Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_110
TABLE 2-3  Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_111
TABLE 2-3  Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_112
TABLE 2-3  Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_113
TABLE 2-3  Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_114
TABLE 2-3  Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_115
TABLE 2-3  Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_116
TABLE 2-3  Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_117
TABLE 2-3  Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_118
TABLE 2-3  Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_119
TABLE 2-3  Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_120
TABLE 2-3  Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_121
TABLE 2-3  Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_122
TABLE 2-3  Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_123
TABLE 2-3  Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_124
TABLE 2-3  Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_125
TABLE 2-3  Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_126
TABLE 2-3  Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_127
TABLE 2-3  Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_128
TABLE 2-3  Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_129
TABLE 2-3 Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_130
TABLE 2-3 Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_131
TABLE 2-3 Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_132
TABLE 2-3 Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_133
TABLE 2-3 Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_134
TABLE 2-3 Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_135
TABLE 2-3 Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_136
TABLE 2-3 Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_137
TABLE 2-3 Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_138
TABLE 2-3 Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_139
TABLE 2-3 Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_140
TABLE 2-3 Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_141
TABLE 2-3 Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_142
TABLE 2-3 Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_143
TABLE 2-3 Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_144
TABLE 2-3 Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_145
TABLE 2-3 Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_146
TABLE 2-3 Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_147
TABLE 2-3 Unit Preventive Maintenance Checks and Services (Continued) - TM-5-5420-212-23_148
PMCS REPORTING.
Section V.  UNIT TROUBLESHOOTING
GENERAL
BOTTOM PANEL, PLUNGER ASSEMBLY
Inspection - TM-5-5420-212-23_153
PALLET LIFTING RING
Service/Repair - TM-5-5420-212-23_155
PALLET TIE DOWN RING
Service/Repair - TM-5-5420-212-23_157
PALLET SHACKLES
Service/Repair - TM-5-5420-212-23_159
PALLET, RUBBER BUFFER
Service/Repair - TM-5-5420-212-23_161
PALLET, REAR BUFFER ASSEMBLY
Inspection - TM-5-5420-212-23_163
TIE DOWN, CARGO AIRCRAFT
Removal (Chain)
PUSH BAR, LINK
Repair - TM-5-5420-212-23_167
ROLLER BEAM, ROLLER ASSEMBLY
Removal - TM-5-5420-212-23_169
HYDRAULIC JACK 15T - TM-5-5420-212-23_170
Installation - TM-5-5420-212-23_171
HYDRAULIC JACK 20T - TM-5-5420-212-23_172
Service - TM-5-5420-212-23_173
LAUNCHING NOSE HEAVY, DOWEL PIN
Installation - TM-5-5420-212-23_175
  LANDING ROLLER PEDESTAL Mk 1 AND Mk 2 (SWIVEL PINS)
Removal - TM-5-5420-212-23_177
Frame/Frame Support Pins
LANDING ROLLER, ROLLER ASSEMBLY
Inspection - TM-5-5420-212-23_180
LAUNCHING NOSE ROLLER, ROLLER ASSEMBLY - TM-5-5420-212-23_181
Inspection - TM-5-5420-212-23_182
ANCHOR ASSEMBLY, BONDED BEARING
Removal - TM-5-5420-212-23_184
ROPE, GUARD
Removal/Installation - TM-5-5420-212-23_186
DAVIT POST ASSEMBLY, LEVELLING SCREW
Service/Repair - TM-5-5420-212-23_188
DAVIT POST ASSEMBLY, PULLEY AND PINS
Service - TM-5-5420-212-23_190
DAVIT POST ASSEMBLY, CHAINS
Removal - TM-5-5420-212-23_192
ANTI-FLUTTER TACKLE - TM-5-5420-212-23_193
Removal/Installation - TM-5-5420-212-23_194
LIGHT TACKLE
ALL DIMENSIONS IN INCHES (mm)
POST TENSIONING ASSEMBLY, GUIDE
Removal - TM-5-5420-212-23_198
POST TENSIONING ASSEMBLY, CATCH ASSEMBLY
Removal - TM-5-5420-212-23_200
POST TENSIONING ASSEMBLY, LEVER ASSEMBLY
Removal - TM-5-5420-212-23_202
POST TENSIONING ASSEMBLY, DISASSEMBLY/ASSEMBLY
Disassembly - TM-5-5420-212-23_204
Inspection/Service
Assembly - TM-5-5420-212-23_206
POST TENSIONING ASSEMBLY, BEARING STRIP
Inspection - TM-5-5420-212-23_208
POST TENSIONING ASSEMBLY, SLIDING BLOCK BEARING PAD ASSEMBLY
Inspection - TM-5-5420-212-23_210
POST TENSIONING ASSEMBLY, SLIDING BLOCK BEARING STRIP
Installation - TM-5-5420-212-23_212
POST TENSIONING ASSEMBLY, SLIDING BLOCK BETALIGHT
Inspection - TM-5-5420-212-23_214
AUNCHING NOSE LINK
Service/Repair - TM-5-5420-212-23_216
ANCHORAGE PIN
COPPER SULPHATE TEST
ANTI-SKID COATING
Patch Painting
Section VII.  PREPARATION FOR STORAGE OR SHIPMENT
CHAPTER 3 DIRECT SUPPORT MAINTENANCE
TABLE 3-1.   Direct Support Troubleshooting - TM-5-5420-212-23_223
TABLE 3-1.   Direct Support Troubleshooting - TM-5-5420-212-23_224
TABLE 3-1.   Direct Support Troubleshooting - TM-5-5420-212-23_225
Section II.  DIRECT SUPPORT MAINTENANCE PROCEDURES
PALLET ADAPTER - TM-5-5420-212-23_227
Repair - TM-5-5420-212-23_228
Repair - TM-5-5420-212-23_229
Repair - TM-5-5420-212-23_230
PUSH BAR ADAPTER, BRACKETS
Repair - TM-5-5420-212-23_232
PANEL ERECTION AID - TM-5-5420-212-23_233
Replace Beam Assembly
Replace Frame Assembly
Replace roller
PUSH BARS SHORT, LONG, END FITTINGS
Repair - TM-5-5420-212-23_238
Repair - TM-5-5420-212-23_239
Repair - TM-5-5420-212-23_240
Repair - TM-5-5420-212-23_241
Repair - TM-5-5420-212-23_242
ROLLER BEAM, PLAIN ROLLER ASSEMBLY
Disassembly - TM-5-5420-212-23_244
Repair - TM-5-5420-212-23_245
ROLLER BEAM, FLANGED ROLLER ASSEMBLY
Inspection - TM-5-5420-212-23_247
LAUNCHING NOSE CROSS GIRDER, ROLLER ASSEMBLY
Inspection - TM-5-5420-212-23_249
HYDRAULIC JACK 15T - TM-5-5420-212-23_250
Disassembly - TM-5-5420-212-23_251
Disassembly
Cleaning - TM-5-5420-212-23_253
Cleaning - TM-5-5420-212-23_254
Inspection - TM-5-5420-212-23_255
Assembly - TM-5-5420-212-23_256
Assembly - TM-5-5420-212-23_257
Assembly - TM-5-5420-212-23_258
Assembly - TM-5-5420-212-23_259
Assembly - TM-5-5420-212-23_260
Testing - TM-5-5420-212-23_261
Testing - TM-5-5420-212-23_262
HYDRAULIC JACK 20T - TM-5-5420-212-23_263
Disassembly - TM-5-5420-212-23_264
Disassembly - TM-5-5420-212-23_265
Disassembly - TM-5-5420-212-23_266
Cleaning - TM-5-5420-212-23_267
Inspection - TM-5-5420-212-23_268
Assembly - TM-5-5420-212-23_269
Assembly - TM-5-5420-212-23_270
Assembly - TM-5-5420-212-23_271
Assembly - TM-5-5420-212-23_272
Assembly - TM-5-5420-212-23_273
Assembly - TM-5-5420-212-23_274
Testing - TM-5-5420-212-23_275
Testing - TM-5-5420-212-23_276
LANDING ROLLER
Inspection - TM-5-5420-212-23_278
LAUNCHING NOSE ROLLER, ROLLER ASSEMBLY - TM-5-5420-212-23_279
Inspection - TM-5-5420-212-23_280
ROCKING ROLLER - TM-5-5420-212-23_281
ROCKING ROLLER - TM-5-5420-212-23_282
Removal - TM-5-5420-212-23_283
Removal - TM-5-5420-212-23_284
Inspection - TM-5-5420-212-23_285
Inspection - TM-5-5420-212-23_286
Repair - TM-5-5420-212-23_287
Installation - TM-5-5420-212-23_288
Installation - TM-5-5420-212-23_289
Installation - TM-5-5420-212-23_290
Installation - TM-5-5420-212-23_291
Installation - TM-5-5420-212-23_292
Installation - TM-5-5420-212-23_293
Installation - TM-5-5420-212-23_294
Appendix A REFERENCES - TM-5-5420-212-23_295
Appendix B MAINTENANCE ALLOCATION CHART - TM-5-5420-212-23_296
EXPLANATION OF COLUMNS IN THE MAC, SECTION II
EXPLANATION OF COLUMNS IN TOOL AND TEST EQUIPMENT REQUIREMENTS, SECTION III
Section II..  MAINTENANCE ALLOCATION CHART
Section II.  MAINTENANCE ALLOCATION CHART - TM-5-5420-212-23_300
Section II.  MAINTENANCE ALLOCATION CHART - TM-5-5420-212-23_301
Section II.  MAINTENANCE ALLOCATION CHART - TM-5-5420-212-23_302
Section II.  MAINTENANCE ALLOCATION CHART - TM-5-5420-212-23_303
Section II.  MAINTENANCE ALLOCATION CHART - TM-5-5420-212-23_304
Section II.  MAINTENANCE ALLOCATION CHART - TM-5-5420-212-23_305
Section III.  TOOLS AND TEST EQUIPMENT
Appendix C EXPENDABLE AND DURABLE ITEMS LIST
DESCRIPTION
Appendix D TORQUE LIMITS
Appendix E WELD PROCEDURES
GLOSSARY - TM-5-5420-212-23_311
GLOSSARY - TM-5-5420-212-23_312
GLOSSARY - TM-5-5420-212-23_313
GLOSSARY - TM-5-5420-212-23_314
GLOSSARY - TM-5-5420-212-23_315
GLOSSARY - TM-5-5420-212-23_316






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.