ARMY TM 5-5420-212-23
MARINE CORPS TM 08676A-23/2
CHAPTER 1
INTRODUCTION
Section I. GENERAL INFORMATION
1-1
SCOPE
This is a maintenance manual for the use of the Unit and Direct Support Maintenance functions. The manual
covers the bridge set, bridge erection set and link reinforcement set components, as allocated by the Maintenance
Allocation Chart in Appendix B of this manual. Further maintenance instructions for MGB can be found in TM 5-5420-
212-10-1, Operator's Manual, and DMWR 5-5420-212, Depot Maintenance Work Requirement.
1-2
MAINTENANCE FORMS, RECORDS AND REPORTS
a. ARMY. Department of the Army forms and procedures used for equipment maintenance will be those
prescribed by DA Pam 738-750, The Army Maintenance Management System.
b. MARINE CORPS. Maintenance forms and procedures will be those prescribed by TM 4700-15/1.
1-3
DESTRUCTION OF ARMY MATERIEL TO PREVENT ENEMY USE
Refer to TM 750-244-3.
1-4
CALIBRATION
Calibration is not required on any equipment at these levels of maintenance.
1-5
PREPARATION FOR STORAGE OR SHIPMENT
Packaging and administrative storage is covered in Chapter 2, section VII of this manual.
1-6
OFFICIAL NOMENCLATURE, NAMES AND DESIGNATIONS
COMMON NAME
OFFICIAL NOMENCLATURE
Adjustable Support
Roller Beam Support, Adjustable, Bridge
Anchor Assembly (AA)
Anchor Piece Assembly
Anchorage Pin Assembly
Anchorage Pin Assembly, Mk 2
Anti-Flutter Tackle (AF)
Anti-Flutter Cable Assembly
Bankseat Beam (BSB)
Beam, Bankseat, Bridge
Baseplate (Single Story)
Baseplate, Roller Beam Support
Baseplate (Double Story)
Baseplate, Building Frame, Bridge
Bottom Panel (BP)
Panel, Bottom, Bridge
Bracing Pin
Pin, Bracing
1-1